Home/Section J reports

Section J energy efficiency reports

Section J energy efficiency reports for commercial buildings and fitouts. We review the proposed work and confirm the report scope, required information and fee before starting.

Suitable for
Class 3 and 5–9 buildings, tenancy fitouts, Class 2 common areas
From (ex GST)
$950 DTS report · J1V3 modelling quoted per project
Includes
Report, clause-by-clause compliance table, notes for the drawings
Turnaround
3–5 business days for a DTS report · J1V3 quoted

Turnaround is confirmed in your quote and starts once all required information is received.

What you receive

  • A Section J report with a clause-by-clause compliance table for your certifier
  • A list of the specifications and notes that need to go on the drawings
  • Glazing and lighting calculations
  • Coordination with your electrical and mechanical designers where needed

What to send

  • Architectural plans, elevations and sections, with floor areas and room or space uses
  • Building classification, and whether the work is a new building, an addition or a fitout
  • Glazing or shopfront schedule, where new glazing is proposed
  • Lighting layout or electrical design, if available
  • Air-conditioning and ventilation design or equipment schedule, if available
  • Whether the report is for a CC or CDC, and which NCC edition your certifier is applying

Missing something? Send what you have and we’ll confirm what else is needed, and whether a DTS report or J1V3 modelling suits the design, before quoting.

How it works

  1. Send the drawings. We review the proposed work and confirm the report scope, the pathway, the required information and a fixed fee, usually within one business day.
  2. Assessment. Each element of the design is checked against the applicable Section J provisions, or the whole building is modelled for a J1V3 assessment.
  3. Options if needed. Where an element does not comply, we set out the practical options and the specifications needed on the drawings.
  4. Report issued. The report and drawing notes are sent to you for your certifier, ready for the CC or CDC application.

Frequently asked questions

Does a commercial fitout need a Section J report?

Often, yes. If the fitout includes new lighting, air-conditioning, glazing or insulation, the certifier will usually want evidence that the new work meets Section J. For many fitouts that mainly means lighting power and controls (Part J7) and air-conditioning (Part J6).

When do I need the report: DA, CC or CDC?

Section J is a building code requirement, so it's usually needed for the construction certificate or CDC. Some councils ask for an energy statement at DA stage for larger buildings. We'll confirm what your certifier needs.

What's the difference between DTS and J1V3?

A DTS report checks each element against the prescriptive tables. A J1V3 assessment models the whole building and compares its annual energy use against a reference building. It gives more flexibility, for example extra glazing offset by better lighting, but costs more to prepare.

Does Section J apply to apartments?

In NSW, individual apartments are covered by BASIX. Section J applies to the common areas of a Class 2 building, such as lobbies, corridors and car parks, and to any commercial parts of a mixed-use building.

How long does a Section J report take?

A DTS report is usually 3–5 business days from complete drawings. J1V3 modelling is quoted per project. Turnaround is confirmed in your quote and starts once all required information is received.

Is NCC 2025 in force in NSW?

Not yet. NSW has announced it will adopt NCC 2025 from 1 May 2027. Until then NCC 2022 applies. Which edition applies to your project generally depends on when the CC or CDC application is lodged, so check with your certifier.

About Section J

Section J sets minimum energy efficiency standards for non-residential buildings: offices, shops, cafes, gyms, warehouses, factories, schools, medical centres, hotels and more. Your certifier needs evidence of compliance before issuing a construction certificate or CDC.

What Section J covers

NCC 2022 PartCoversTypical issues
J4 Building fabricRoofs, ceilings, walls, floors and glazingTotal wall-glazing U-value, SHGC, thermal bridging in steel framing
J5 Building sealingAir leakage around doors, windows, exhausts and roof lightsSeals on entry doors, dampers on exhaust fans
J6 Air-conditioning & ventilationPlant efficiency, controls, fans, ductwork and pipework insulationTime switches, economy cycles, minimum EER and COP
J7 Artificial lighting & powerLighting power density and lighting controlsWatts per m² for the space type, occupancy sensors, exit signs
J8 Heated water & pool plantHot water systems, pool and spa heating and pumpsSystem type, pump timers, pool covers
J9 Monitoring & energy resourcesEnergy meters, provision for solar PV and EV chargingMetering thresholds by floor area

Two ways to comply

Deemed-to-Satisfy (DTS) report

We check each element of the design against the prescriptive DTS provisions and record the result in a compliance table: R-values, glazing performance, lighting allowances and plant requirements. It is the quickest and most economical route and suits most fitouts and straightforward new buildings.

J1V3 verification (energy modelling)

For glass-heavy designs, or where DTS would force costly upgrades, we model the whole building’s annual energy use and compare it with a reference building that just meets DTS. If the proposed building uses less, it complies, even if individual elements don’t meet the tables. DTS or J1V3: which pathway? →

Fitouts: what usually applies

Most tenancy fitouts don’t change the building envelope. The report then focuses on the new work, which usually means:

  • Lighting: allowed watts per square metre for each space type, plus occupancy and time controls
  • Air-conditioning: minimum plant efficiency, time switches and ductwork insulation
  • Any new glazing or shopfront: performance of the new glazing system
  • Exhaust and kitchen ventilation for food premises
Coming in 2027

NSW will adopt NCC 2025 from 1 May 2027. It adds on-site solar PV requirements, battery-ready switchboards and tighter fabric, HVAC and lighting standards for commercial buildings. What changes and who it affects →

Send your plans for a fixed quote.

We confirm the assessment scope, required information and fee before work begins. Turnaround is confirmed in your quote and starts once all required information is received.